All you need to know about powerful new U.S.-India satellite NISAR ahead of its launch

The NASA-ISRO Synthetic Aperture Radar (NISAR) satellite is slated for a launch no earlier than Wednesday, July 30.
UPDATED JUL 25, 2025
On July 30, 2025, ISRO’s GSLV-F16 will launch NISAR, the first joint Earth observation satellite by ISRO & NASA, from Sriharikota (Cover Image Source: X | ISRO)
On July 30, 2025, ISRO’s GSLV-F16 will launch NISAR, the first joint Earth observation satellite by ISRO & NASA, from Sriharikota (Cover Image Source: X | ISRO)

A groundbreaking joint mission between the United States and India is poised for liftoff, with the NASA-ISRO Synthetic Aperture Radar (NISAR) satellite targeting a launch readiness date as early as Wednesday, July 30, 5:40 p.m. IST (8:10 a.m. EDT), as per ISRO on X. This collaborative endeavor, hailed by President Donal Trump and Prime Minister Modi as a landmark in civil space cooperation, promises to usher in a new era of Earth monitoring, as mentioned on NASA



 

The advanced Earth-observing satellite, developed by the Indian Space Research Organisation (ISRO) and NASA, will depart from ISRO's Satish Dhawan Space Centre aboard an ISRO Geosynchronous Launch Vehicle. NISAR is distinguished as the first satellite to incorporate both L- and S-band radar systems. NISAR's primary objective is to conduct comprehensive scans of nearly all of Earth's land and ice surfaces, repeating these observations every 12 days. Its sophisticated radar technology will enable detection of minute surface changes, down to fractions of an inch. This unprecedented capability will provide crucial insights into shifts in terrestrial ecosystems, the expansion and contraction of ice formations, and tectonic movements within the Earth's crust. 



 

The mission's dual synthetic aperture radars will penetrate clouds and light rain, allowing for continuous, day-and-night monitoring. This will prove invaluable for tracking areas prone to earthquakes and landslides, and for precisely measuring the dynamics of glaciers and ice sheets, including unparalleled coverage of Antarctica, according to NASA's Jet Propulsion Laboratory. Data generated by NISAR is expected to have broad applications, from enhancing disaster response and infrastructure monitoring to informing agricultural decisions. Specifically, the satellite's ability to identify subtle surface deformations could aid in predicting volcanic eruptions, assessing earthquake risks by differentiating between slow fault movements and locked segments, and evaluating the stability of critical infrastructure like dams and levees over time. 

The NISAR satellite was encapsulated in its payload fairing at ISRO’s Satish Dhawan Space Centre on July 18 in preparation for launch on the Geosynchronous Launch Vehicle on July 30 (Image Source: ISRO)
The NISAR satellite was encapsulated in its payload fairing at ISRO’s Satish Dhawan Space Centre on July 18 in preparation for launch on the Geosynchronous Launch Vehicle on July 30 (Image Source: ISRO)

NISAR's main body, approximately the size of a pickup truck, houses the dual-radar payload: a 10-inch L-band system and a 4-inch S-band system. These distinct radar wavelengths are designed to detect varying land and ice features, providing comprehensive data on attributes such as moisture content, surface roughness, and motion. This dualband approach marks a significant advancement over previous SAR missions. Engineers from ISRO's Space Application Centre in Ahmedabad developed the S-band radar, while NASA's Jet Propulsion Laboratory (JPL) in Southern California was responsible for the L-band radar. The satellite's instruments were integrated with a modified ISRO 13K spacecraft bus and rigorously tested before its transfer to the launch site in May 2025. 

Space Applications Centre (SAC) at Ahmedabad is spread across two campuses, having multi-disciplinary activities (Image Source: ISRO)
Space Applications Centre (SAC) at Ahmedabad is spread across two campuses, having multi-disciplinary activities (Image Source: ISRO)

This mission is projected to generate an immense volume of data, approximately 80 terrabytes daily, which will be processed, stored, and distributed via cloud infrastructure, ensuring universal accessibility. This wealth of information, especially the L-band radar's ability to penetrate forest canopies and the S-band radar's suitability for crop monitoring, will allow researchers to track changes in forests, wetlands, agricultural zones, and permafrost with striking detail and frequency. 

The NISAR mission is a testament to international collaboration, with responsibilities divided between key institutions. NASA's Jet Propulsion Laboratory (JPL), managed by Caltech in Pasadena, spearheaded the US contribution, providing the critical L-band SAR, alongside the radar reflector antenna, a deployable boom, and essential communications and data handling subsystems. The L-band data will be received via NASA's Goddard Space Flight Center, which manages the Near Space Network, as mentioned on JPL.



 

On the indian side, the ISRO Space Applications Centre developed the S-band SAR, while the U R Rao Satellite Centre supplied the spacecraft bus. Launch services will be provided by the Satish Dhawan Space Centre using a rocket from the Vikram Sarabhai Space Centre, with ISRO Telemetry Tracking and Command Network handling satellite operations. The National Remote Sensing Centre will manage S-band data reception and product dissemination. 

MORE STORIES

China's space agency stated that damage to the Shenzhou spacecraft, carrying three astronauts, is suspected to be the result of a 'tiny piece of space debris.'
1 hour ago
For 25 years, the station has maintained a continuous human presence in orbit since welcoming its first crew on November 2, 2000.
1 day ago
The Shenzhou-21 manned spacecraft launches today at 11:44 p.m. Beijing Time (11:44 a.m. EDT) from the Jiuquan Satellite Launch Center.
5 days ago
This launch will further grow the Starlink constellation, an enormous LEO system that is already the planet's largest satellite network for internet access.
6 days ago
At 8:00 p.m. ET on Saturday, October 25 (Sunday, 9:15 a.m. JST), the new H3 rocket lifted the uncrewed freighter from the Tanegashima Space Center.
Oct 27, 2025
The mission deployed the 2nd and final satellite, completing the Spainsat Next Generation (NG) network for the Spanish Ministry of Defense.
Oct 24, 2025
The originally proposed concept, the Uranus Orbiter and Probe (UOP), anticipated a minimum 13-year cruise time to reach Uranus using a Falcon Heavy rocket.
Oct 22, 2025
Sean Duffy plans to 'open up the contract' to new bidders, directly challenging the 2021 selection of SpaceX's Starship for the pivotal Artemis III lunar landing.
Oct 21, 2025
Though the Ship achieved a 'picture-perfect' soft landing in the Indian Ocean after its hour-long journey, the massive Super Heavy booster wrapped up its mission just over six minutes after liftoff.
Oct 17, 2025
The cosmonauts' work officially began at 12:50 p.m. EDT (1650 GMT), marking the 276th spacewalk in the history of the continuously crewed International Space Station.
Oct 17, 2025